Seven-level parking garage cleaning at Modera Scottsdale.

A roughly 258,000-square-foot parking structure required production cleaning across enclosed lower levels and an exposed seventh-floor deck. Patriot completed all seven levels in two days while adapting the plan around live property conditions and protecting normal resident and property operations.

  • Completed April 2026
  • Seven levels
  • Approximately 258,000 sq. ft.
  • Completed in two days
  • Zero reported damage
  • Zero complaints
7Levels completed
2 daysStart to finish
0Reported property damage
0Resident or client complaints

Visible proof

The cleaning line tells the story.

These are not staged “before” and “after” photographs taken hours apart. Each image captures both conditions in one frame: uncleaned concrete beside the freshly cleaned surface while work was underway.

Patriot cleaning the seventh-floor parking deck at Modera Scottsdale with a visible cleaned and uncleaned line

Seventh floor

Open-air upper deck

The seventh-floor image shows the production difference across the parking stalls while the ride-on surface cleaner advances through the exposed deck.

Patriot cleaning the first-floor parking level at Modera Scottsdale with a visible cleaned and uncleaned line

First floor

Enclosed lower level

The first-floor image documents controlled cleaning around traffic markings, accessible parking areas and building access points.

Commercial process

Fast production. Controlled execution.

Patriot completed the seven-story structure in two days without reported property damage or complaints. The crew sequenced work to minimize disruption, then adapted in real time as access, traffic and site conditions changed.

Request a Commercial Site Assessment
Operational planningCoordinate mobilization, work zones and level-by-level sequencing around residents and property operations.
High-speed production cleaningUse commercial ride-on and hot-water equipment to complete approximately 258,000 square feet in two days.
Wastewater managementApply project-specific recovery and water-control methods.
Adaptable, documented closeoutAdjust to changing site conditions while capturing progress and completion proof for the property team.

Parking structures and large properties

Need a realistic cleaning plan?

Tell us about the structure, access requirements and schedule. We’ll review the scope and recommend the right production approach.